01. Office and living areas
This flat-pack camp brought site offices and workforce accommodation into one 106-unit project. The office area and living area were assigned to separate groups of units, allowing each part of the camp to serve its own daily activities.
The white living-area units and grey office-area units give the camp a clear visual distinction. The grey-framed blocks use two-storey construction; repeated door and window openings follow the individual room bays. The office and living areas use the same building format without being treated as the same room layout.

02. Components arrive on site
The flat-pack office and accommodation camp arrived as stacked floor and roof sections, columns and enclosure components. The delivery truck, handling equipment and component stacks occupied the same working area while installation was under way.
This is where the transport format becomes part of the site plan. The receiving team needs room to unload and keep the next components accessible without blocking the building footprint. Flat-pack delivery reduces the volume occupied by empty room space during transport, but unloading and assembly space still have to be planned.

03. Floors and frame connections
The assembly photographs show floor sections positioned at prepared supports and columns connected at the frame corners. The units were assembled on site rather than supplied as fully enclosed rooms. For a new project, support positions and connection details must be checked against the selected system's drawings.
The column-to-floor interface is a repeated detail in the flat-pack system. Support positioning and floor-frame alignment need to be coordinated with the installation team. Connection requirements, fasteners and tightening instructions should be confirmed from the project drawings, not inferred from a photograph.


04. Panels, doors and windows
The installation views include wall-panel stacks beside the assembly areas, and doors and windows in the room elevations. In the white units, the panel package can be seen inside the open frame before the enclosure is complete.
For this type of camp, the product advantage is the combination of a repeatable frame and room-specific fit-out. Office and accommodation layouts can use the same modular format while keeping different partitions, entrances and service requirements. The actual layout, finishes and service provisions can be customized to suit each project.

05. Planning a similar camp
A new office and accommodation camp should start with the room list and available plot. Confirm who will use the offices, how accommodation will be arranged, and where delivery vehicles can unload. The room mix, building arrangement and installation plan can then be developed around the actual project.
Shantou has a humid, coastal monsoon climate. For a similar camp in this region, review site drainage, panel storage protection, ventilation and wind exposure before confirming the specification. Weather limits for unloading and lifting must follow the equipment instructions and the competent team's plan. Structural loads and connection requirements need project-specific engineering confirmation.
Premium Modular House can coordinate the flat-pack package with the proposed office and living-area functions. Start with the Flat-Pack Container House product page, then review site office planning and worker accommodation options.
For the steps before the first truck arrives, read our flat-pack camp site preparation guide. For construction-site delivery planning, the UK Health and Safety Executive provides a useful traffic-management reference on separating pedestrians and vehicles. Local requirements and the project's site procedures govern the work.
Prepare a new-project brief
Use this case to discuss a similar office and living camp, rather than copy its unit count. The recorded 106 units are building units, not a verified bed count. The project record distinguishes white living-area units from grey office-area units; it does not provide a room-by-room occupancy schedule for another site.
| Planning input | What to send |
|---|---|
| Office functions | Workspaces, meeting rooms and any separate administration or support rooms, with approximate users. |
| Accommodation | Required rooms, intended occupancy and whether sanitary, dining and other support spaces are shared or separate. |
| Site and climate | Destination, available plot, access and utility information, plus the project team’s design requirements. |
| Delivery and site work | Receiving area, unloading resources, component storage, installation responsibilities and target handover sequence. |
| Quotation boundary | The proposed module schedule, finishes, services and the factory, transport and site items to include or exclude. |
The photographs above show the office elevations, component receiving, floor and frame work, and panel installation. They do not establish a standard foundation, connection capacity or installation rate. Keep those items tied to the new project’s approved drawings and site plan.
For the room-function checklist, read flat-pack offices and staff facilities. Use the site office guide for office and WC planning, or compare the 73-unit office and accommodation project. Send your own room and scope brief to discuss a project-specific proposal.
06. Project questions
How many flat-pack units were used?
The Shantou office and accommodation camp project used 106 flat-pack container units in total.
Was this a modular school building?
No. The units formed temporary offices and workforce accommodation supporting the school construction project.
How were the two areas distinguished?
White units were allocated to the living area and grey units to the office area. The same flat-pack building format supported the different uses.
Can the camp layout be adapted for another project?
Yes. Room functions, unit quantities, storey arrangement, finishes and services can be planned to suit the actual site and project requirements. A new layout needs its own technical review.