Factory-prepared modular building system

Flat-Pack Container House

Flat-pack container houses use pre-assembled roof and floor modules, with wall panels, openings and selected services coordinated for the approved building layout. They can be configured for accommodation, offices and shared project facilities.

Pre-assembled roof and floor modulesConfigurable room layoutsProject-based supply scope
L-shaped two-storey flat-pack modular building during site assembly
Flat-pack modular building during site assembly. Final arrangement and finishes are confirmed for each project.
Steel modular frames suspended above workshop fabrication equipment
Modular frame handling during factory preparation.

Building system

Factory-Prepared Modules

The roof and floor modules are prepared before dispatch. Wall panels, posts, doors, windows and selected service provisions are then coordinated against the approved layout and supply scope.

  • Primary modulesRoof and floor modules prepared for the selected flat-pack configuration.
  • EnclosureWall panels, doors, windows and finishes selected for the intended use.
  • Room planningOpenings, circulation and connections coordinated across single- or multi-unit layouts.
  • Supply packageAccessories, packing and shipment batches aligned with the confirmed quotation.

Configuration scope

Specifications & Options

The quotation confirms what is standard, what is optional and what must be coordinated for the destination. Dimensions, materials and fittings can be adjusted when the project requires a different specification.

As a flat pack container house manufacturer and supplier in China, PMH coordinates the roof and floor modules, enclosure and selected fittings against the approved drawings. Confirm these specification items for the exact model:

01

Layout & circulation

Building use, room schedule, unit quantity, storeys, corridors, stairs and module connections.

02

Envelope & finishes

Wall system, insulation, roofing, doors, windows, interior finishes and any required wet-area treatment.

03

Electrical & services

Lighting, switches, sockets, wiring, water supply and drainage provisions. Australian, US and European electrical arrangements can be specified for the project destination.

04

Delivery & site

Destination port, shipment sequence, unloading access, foundation, utilities and the required assembly-support scope.

Published configuration references

  • 20-foot reference: 5990 × 2438 × 2896 mm external dimensions; galvanized steel frame and insulated sandwich-panel enclosure. The published preliminary packing reference is 6–8 sets per 40-foot high-cube container, subject to the packing plan.
  • 3 m-wide reference: 6055 × 2990 × 2896 mm external and 5845 × 2780 × 2550 mm internal dimensions. The published standard schedule lists Q235B galvanized cold-formed steel, a 100 mm wall assembly with 75 mm glass-wool core, and 19 mm cement-fibre floor board.

These are distinct model references, not interchangeable specifications. Confirm the selected model, component schedule, options and project design basis in the quotation. See the linked product overview for the current schedule.

Transport and installation programme

Flat-pack packages combine pre-assembled roof and floor modules with the remaining components for destination assembly. Request a packing list showing package dimensions, weights, lifting points and the number of packages per shipping container or truck. The loading plan, sea-freight route, destination port and inland access determine the transport method; there is no single loading quantity for every configuration.

The published 20-foot reference lists a crew of four and approximately three hours of unit assembly under normal site conditions. This is a preliminary unit-assembly reference; foundations, utilities, multi-unit connections, inspection and complete handover require separate programme allowances. Agree an installation programme after the layout, quantities, crew, lifting equipment and site readiness are known. It should separate foundations and unloading, module assembly and weather sealing, service connections, inspection and handover. Ask for working days and crew assumptions for your configuration rather than treating a demonstration assembly time as a complete building schedule.

For model details, review the flat-pack specification overview and procurement guide.

Final selections and included items are recorded in the approved quotation and project documents. Destination standards and approval requirements should be identified before the specification is confirmed.

Project references

Flat-Pack Project References

Review completed project records to see how flat-pack modules have been arranged for command, accommodation and shared camp functions.

01

Philippines Flat-Pack Command Center

Connected modules configured for command, briefing and site-management functions.

View project
02

Philippines PV Engineering Camp

A 278-unit flat-pack accommodation project planned with office, dining and residential zones.

View project

Product range

Flat-Pack Container House Products

Select a product to review its current configuration, images and enquiry details. The final dimensions, materials, fittings and destination requirements are confirmed for each order.

Procurement questions

Flat-Pack Container House FAQs

Confirm the system type, options and project inputs before comparing quotations or planning transport and site work.

Review the flat-pack site preparation checklist before dispatch.

Which specifications should a supplier quotation confirm?

Confirm external and internal dimensions, frame and connection details, roof and floor build-up, wall and insulation selections, door and window schedule, electrical provisions and wet-area fittings for the offered model. Ask which drawings, test evidence and destination documentation apply; do not assume all options are included.

How long does flat-pack container house installation take?

The duration depends on quantity, layout, storeys, crew, lifting equipment, foundations, weather and services. Request a project programme with assembly working days, crew assumptions and site-work exclusions after drawings and scope are agreed.

How are flat-pack container houses shipped?

The roof and floor modules and remaining components are packed for transport. The approved package dimensions, weights and loading plan determine container or truck requirements. Confirm freight terms, unloading, customs and inland delivery responsibilities before ordering.

How is a Flat-Pack Container House different from a Detachable Container House?

The flat-pack system uses pre-assembled roof and floor modules. A detachable system is supplied as individual structural and enclosure components for site assembly. Their packing arrangements and site-work requirements are therefore different.

Can the dimensions, materials and room layout be customised?

Yes. The standard configuration is a starting point. Dimensions, frame and enclosure selections, doors, windows, interior finishes, room functions and service provisions can be reviewed against the project requirement. The approved quotation records the final configuration.

Can the electrical system suit different countries?

Yes. Switches, sockets, wiring and related electrical provisions can be specified for Australian, US, European and other destination requirements. The applicable arrangement should be confirmed before production.

What information is needed for a quotation?

Provide the project country, building use, quantity, room schedule or layout, preferred finishes, electrical and wet-area requirements, destination port, site conditions and target delivery date. Drawings and reference specifications help define the supply scope.

Project enquiry

Plan Your Flat-Pack Project

Send the building use, quantity, room layout, destination and known site conditions. Include drawings, required standards and delivery timing when available.

Request a Project Quote