A project-based method for comparing modular camp cost across scope, transport, site work, capacity, operation and technical evidence.

Updated

Flat-pack modular accommodation camp arranged for a remote project
Flat-pack modular accommodation camp arranged for a remote project

Reducing remote construction camp cost starts with a comparable project scope. A lower module price does not prove a lower delivered cost. Building specification, packing, freight, site works, installation, utilities, supporting facilities and the planned operating period must be evaluated on the same basis.

Use one cost boundary for every option

Total delivered camp cost = building package + packing and freight + port and inland handling + site works + installation + utilities and support facilities + testing and handover + defined project allowances.

Build one cost model

Start with the project location, workforce by phase, room and facility schedule, operating period, site access, available utilities and destination requirements. These inputs establish what must be priced and prevent a low unit rate from hiding omitted work.

Record the currency date, tax basis, delivery term and responsibility boundary for every proposal. Separate confirmed prices, project allowances and excluded work so that the comparison can be updated when freight, local labour or the programme changes.

Align the quotation scope

Suppliers may divide the same camp differently. One quotation may include sanitary rooms, circulation and loose accessories, while another lists only standard modules. Convert every offer into the same cost schedule before comparing totals.

Compare each proposal against the same commercial and technical boundary.
Cost groupItems to identifyComparison check
Building packageFrames, envelope, openings, finishes, internal services, sanitary modules and furnitureSame room schedule, dimensions and specification
TransportPacking, export loading, freight, port charges, inland haulage and unloadingSame destination, delivery term and shipment basis
Site worksSurvey, foundations, drainage, roads, utility networks and external worksIncluded, client supplied or carried as an allowance
InstallationAssembly scope, lifting, temporary works, connections, testing and supervisionSame completion point and site assumptions
OperationEnergy, water, cleaning, maintenance, replacement and demobilisationSame operating period and occupancy scenario

Close the gaps between two offers

Illustrative comparison—not a PMH quotation: Offer A covers flat-pack building components delivered to a named port, with site assembly and utility connections excluded. Offer B covers buildings with a specified fit-out and delivery to the site, but still excludes foundations and external services. Their headline totals are not yet comparable, even if both list the same number of units.

First put both offers against the same room schedule, specification, transport state, delivery endpoint and completion point. Then identify the cost and responsible party for every missing item. An exclusion is not a zero-cost item, and an unpriced allowance is not a confirmed saving. Do not substitute the unit count for verified usable bed capacity.

Send a comparable quotation brief

Copy the following fields into the enquiry. For each line of the returned quotation, ask the supplier to mark included, allowance, buyer/site supplied, or excluded, and reference the relevant drawing or schedule.

  • Revision basis: quotation reference and date, currency, validity, tax basis and the layout/material schedule revisions used.
  • Building schedule: quantities by function, module dimensions, room use, occupancy assumptions and the selected fit-out.
  • Delivery basis: packing and shipping format, named delivery location, freight assumptions, unloading and storage responsibilities.
  • Site completion: assembly, stairs and walkways, service connections, supervision, testing and the agreed handover condition.
  • Open costs: each provisional or excluded item, who will obtain the local price, and when the comparison will be updated.

Keep the comparison tied to one revision set. If the room layout, shipment plan or scope changes, update the affected lines before selecting the apparent lowest total.

Use the flat-pack system page to define the proposed building format and the 73-unit project record to distinguish room bodies from support and circulation scope. The supplier delivery checks explain how to connect the offer to named responsibilities and records. Send your schedule for a like-for-like quotation review; include known exclusions rather than only a target unit price.

Cost the transport plan

Transport performance cannot be judged from the product name. Request the proposed packing configuration, package dimensions and weights, loading quantity, shipment count, route, handling method and responsibility at each transfer point.

Compare the total logistics chain from factory release to the site laydown area. Include port or terminal handling, inland route restrictions, permits where applicable, unloading access, storage protection and the risk of split deliveries. Freight rates and route conditions are project inputs, so any claimed saving should be recalculated for the actual destination.

Price the site work

Factory completion only reduces site work when the offered scope, route and installation method support it. Compare what arrives completed, what must be assembled locally, which loose components are included and where electrical, plumbing, fire and external utility connections begin and end.

The cost plan should align delivery with foundation and utility readiness, lifting access, laydown space and inspection points. Programme comparisons are meaningful only when they use the same starting condition and completion definition.

Plan the usable capacity

Use normal and peak workforce numbers by project phase rather than one maximum headcount. Separate accommodation, office, dining, sanitary, laundry, medical, storage and recreation functions, then identify which facilities can be phased, shared or relocated.

For accommodation-led comparisons, calculate both cost per usable bed and cost per planned occupied bed-month:

  • Delivered cost per usable bed: total delivered camp cost divided by confirmed bed capacity
  • Cost per occupied bed-month: capital, logistics and estimated operating cost, less any supported residual value, divided by forecast occupied bed-months

These indicators do not replace the total budget. They reveal whether one option carries unused rooms, omitted shared facilities or an operating period that differs from the other proposals.

Include the full operating period

Cooling, hot water, lighting, water treatment, cleaning and maintenance can materially affect a camp operated for several years. Compare these items using the same climate data, occupancy, utility tariffs, maintenance plan and analysis period. The NIST Building Life Cycle Cost resources explain the principle of comparing alternatives across initial and operating costs over a defined study period.

Relocation or resale should not be entered as an automatic saving. Include a residual value only when the project has a realistic reuse plan, suitable handling route, expected condition and an identified cost for dismantling, transport, refurbishment and recommissioning.

Read the 73-unit scope

Premium Modular House’s documented 73-unit Quanzhou project combined 44 office box bodies, five living-support box bodies and 24 accommodation box bodies. Stairs, corridor modules, raised terraces, connectors, walkways, guardrails, flooring and entrance canopies were identified separately from the physical room count. Review the 73-unit office and accommodation project.

The 73-unit project demonstrates why unit price alone is incomplete: two offers with the same headline quantity can contain different circulation, sanitary, accessory, transport and installation scope. Compare delivered scope and usable capacity when assessing potential savings.

Verify the cost assumptions

A cost comparison is reliable only when the technical basis is comparable. Drawings, material schedules, calculations, inspection records, packing plans and scope matrices should refer to the offered configuration. Destination law and the project owner’s requirements determine the final acceptance criteria.

Connect each cost assumption to evidence and a named responsibility boundary.
Decision areaEvidence to reviewCost risk controlled
Capacity and layoutRoom schedule, occupancy, circulation and facility listUnused capacity and missing shared facilities
SpecificationMaterials, dimensions, envelope, finishes and service schedulesNon-comparable unit prices and later upgrades
LogisticsPacking list, package data, shipment plan and route assumptionsExtra shipments, handling and access changes
Site interfacesFoundation, utility, lifting, assembly and testing boundariesOmitted local works and duplicated scope
OperationOccupancy, climate, utility assumptions and maintenance planUnsupported lifecycle and residual-value claims

The IFC and EBRD guidance on workers’ accommodation is a useful reference for planning and operating worker housing. It also reinforces that accommodation quality and management requirements should not be removed merely to reduce the purchase price.

Prepare the cost-review brief

To begin, provide the country and project location, approximate workforce by phase, required camp functions, target date and available utilities. A preliminary site plan and destination port are useful when available. Detailed logistics, installation and responsibility assumptions can be developed during the project review.

Premium Modular House can then compare relevant building systems, identify scope gaps and prepare a project-specific cost basis instead of a unit-price-only quotation.

On this page
  1. 01Build one cost model
  2. 02Align the quotation scope
  3. 03Close the gaps between two offers
  4. 04Cost the transport plan
  5. 05Price the site work
  6. 06Plan the usable capacity
  7. 07Include the full operating period
  8. 08Read the 73-unit scope
  9. 09Verify the cost assumptions
  10. 10Prepare the cost-review brief