Comparing Flat-Pack Site Office Quotations
What a flat-pack site office quotation should state, line by line, so that two supplier offers can be compared on the same scope.
Short answer: Two quotations can only be compared fairly when both price the same written brief and state the same lines. Ask each supplier to show:
- the drawing and configuration the price is based on, with module types and quantities;
- the specification of each module: frame, wall and roof panels, insulation, floor, doors and windows;
- the electrical scope: supply standard, distribution board, lighting, sockets, air-conditioning provision and data;
- the interior fit-out: partitions, finishes, furniture, toilets and any wet areas;
- packing, the delivery term and the named delivery place;
- the site work on each side, the programme and the acceptance checks;
- the validity, payment terms and every exclusion.
Then mark each line as included, optional, your scope or still open, and compare only lines that describe the same thing.

Price one brief, not two
Many differences between quotations start before the price. If one supplier prices a layout it drew itself and another prices yours, the two numbers describe different buildings. Send both suppliers the same brief:
- the office functions: open-plan workstations, managers' offices, meeting rooms, reception, security and document rooms;
- the number of people in each space, and any toilets or kitchenette;
- the number of storeys and how the modules connect;
- the destination, climate and electrical standard;
- the date the offices must be in use.
The office and accommodation planning guide shows how to turn functions into a room-by-room brief. Premium Modular House (PMH) configures Flat-Pack Container House offices, meeting rooms, reception, security and site-management spaces to the required room schedule, so the brief sets the scope, not a catalogue layout.
PMH's published site office projects show how widely briefs vary: a six-module site office in Alberta, an eight-module command centre in the Philippines, and the 73-unit Quanzhou project, which combines office, living-support and accommodation zones. These are module counts, not desk counts, and none of them sets the layout for another site.
The lines every quotation should show
Ask both suppliers to answer the same lines, in the same order:
| Line | What the quotation should state | Why it changes the comparison |
|---|---|---|
| Basis of the offer | Drawing and specification revision, module types and quantities | Prices for different layouts cannot be ranked |
| Structure | Steel grade and coating, member sections, connection method | The frame specification affects durability, multi-storey use and cost |
| Wall and roof panels | Panel thickness, core material and insulation | The build-up decides thermal performance and which fire documents you need |
| Floor | Board type, thickness and finish | Floor boards and finishes vary more than they appear |
| Doors and windows | Number, size, type, glazing, mesh and screens | Offices often need different glazing and security from accommodation |
| Electrical | Supply standard, distribution board, lighting, sockets, air-conditioning provision, data | Often the largest hidden difference |
| Interior fit-out | Partitions, ceilings, finishes, furniture, toilets and wet areas | Furniture and fit-out are often priced separately |
| Packing and delivery | Packing list, delivery term, named place, freight validity | Decides what the price covers after the factory |
| Site work | Foundations, unloading, lifting, assembly support, connections | Shows what stays in your budget |
| Programme and acceptance | Working days, crew assumptions, inspection points, documents | Decides when the offices can be used and how they are accepted |
| Commercial terms | Validity, payment terms, warranty scope, exclusions | Two prices on different terms are not equal |
As an example of the detail to expect, PMH's published standard schedule for its 3 m-wide flat-pack configuration lists Q235B galvanised cold-formed steel, a 100 mm wall assembly with a 75 mm glass-wool core and a 19 mm cement-fibre floor board. Ask every supplier to state the same items in the same units, and treat a different model reference as a different specification, not an equivalent one.

Check the electrical scope line by line
Electrical scope is where similar-looking site office quotations often differ most, because offices carry more lighting, sockets, computers and air conditioning than accommodation. For each room type, ask for:
- the supply voltage, frequency and socket standard;
- the distribution board and circuit protection;
- the lighting, and the number and position of sockets;
- the air-conditioning provision: a socket and sleeve only, or a supplied unit;
- data cabling or empty conduit;
- the connection point to the site supply, and who makes it.
PMH coordinates the distribution board, lighting, sockets and air-conditioner provision to the destination requirement, and can specify switches, sockets and wiring for Australian, US, European and other destinations. Where applicable, CE, UL or SAA marked components can be selected, but component marks do not certify the complete building.
If the offices include toilets or a kitchenette, add fixtures, waterproofing, water and drainage connections and ventilation as separate lines. A quotation that names a toilet module without these interfaces is incomplete.
Split the site work before comparing
A low price can move work to your side of the contract. List each stage and name who does it: survey and foundations, unloading and lifting, assembly, connections between modules, stairs and corridors, utility connections, testing and local approvals. A stage marked "by others" still needs an owner.
Treat installation time the same way. PMH's published 20-foot reference lists a crew of four and about three hours to assemble one unit under normal site conditions, but that covers the unit only. Ask each supplier for working days and crew assumptions for the whole building, separating foundations and unloading, assembly and weather sealing, service connections, inspection and handover.

For delivery, the guide to shipping modular buildings from China lists what a supplier needs to price loading, freight and delivery to site.
Normalise, then compare
Put both quotations into one comparison sheet: one row per line, one column per supplier. For every line, record the offered scope, the exclusions, the responsible party, the supporting document and any open question, and keep the drawing and specification revision beside each answer. Mark a line as agreed only when both sides have accepted the scope and its documents; a completed answer alone does not establish compliance or acceptance.
Then:
- treat an empty cell as an open item, not a free inclusion;
- bring both offers to the same delivery term before comparing totals;
- compare the total for the same scope first, then the cost per usable square metre if the layouts differ;
- rank the offers only after the material gaps are closed.
Example: two quotations name different delivery points
For the same office package, Offer A prices delivery to the destination terminal. Offer B prices delivery to the project gate and leaves unloading open.
Ask both suppliers to quote to the same gate address on the same delivery terms. Have each supplier mark terminal charges, customs clearance, duties and taxes, inland transport and unloading as included, separately priced or the buyer’s responsibility. Compare totals once both confirm the same scope.
Watch for these warning signs:
- a unit price with no drawing, material schedule or scope boundary;
- performance values with no design basis or approval route;
- installation time guaranteed before site access, labour and foundation readiness are known;
- toilets or a kitchen named without plumbing, waterproofing, ventilation and utility interfaces;
- several model names for the same offered configuration.
The flat-pack procurement guide gives a line-by-line clarification sheet for closing the remaining gaps.
Send your site office brief to PMH. Include the room list or layout, headcount, storeys, destination and electrical standard, so the quotation can be returned line by line on the same scope as other offers.
Questions buyers ask
Should we compare price per module or per square metre?
Module sizes differ between suppliers, so a price per module can mislead. Compare the total for the same scope first, then the cost per usable square metre.
One quotation includes freight and the other does not. How do we compare them?
Bring both to the same delivery term and named place, or add the missing stages to the cheaper offer as separate lines, marked as your own estimates.
Is office furniture included in a flat-pack quotation?
Not by default. PMH confirms floor finish, internal fixtures, furniture and equipment separately, and representative interiors in its product gallery are not automatic inclusions.
How do we compare installation times?
Ask for working days and crew assumptions for the whole building. A demonstration time for one unit is not a building programme.