- Workforce and shift profile
- Confirm total personnel, occupancy by phase, room-sharing rules, shift changes and peak use of sanitary or welfare facilities.
- Usable plot and control boundary
- Provide the support-area boundary, access points, restricted zones, road connections, ground levels and required separation from operations.
- Climate and exposure
- State temperature, wind, rainfall, dust, salt or corrosion conditions that affect structure, envelope, cooling and external circulation.
- Utilities and wet services
- Identify available power, water, hot-water and wastewater connections together with the boundary to external infrastructure.
- Delivery and installation plan
- Confirm route limits, shipment sequence, unloading space, lifting method, foundations, labour, approvals and installation responsibilities.