← Container House Systems

Bolted modular building product

Detachable Container House

Factory-prepared frame, roof, floor and enclosure components are packed separately, identified for shipment and assembled into complete units at the destination.

5990 × 2990 mm reference · Basic and quality schedules · Bolted site assembly

01 / 06 Finished detachable container house with installed door, window and wall panels

Detachable Container House

Complete product description

A separated component package assembled into a complete building

The Detachable Container House is a bolted modular building system supplied as coordinated structural, roof, floor, wall and opening components.

Columns, beams, panels, boards, doors, windows and selected electrical items are prepared for the approved model before shipment.

At the destination, the parts are unloaded, checked against the packing list and assembled in sequence on a prepared bearing surface.

The floor frame, columns and roof frame establish the primary structure before the enclosure, openings and selected services are installed.

The supplied schedules document basic and quality references for the same 5990 × 2990 × 2800 mm external size. Member thicknesses, sheet gauges, openings, electrical scope, finish and packing method must follow the selected order schedule.

Product type
Bolted detachable modular building kit
Reference size
5990 × 2990 × 2800 mm external
Configuration basis
Basic 2.0 mm and quality 2.3 mm frame schedules
Transport form
Protected structural and enclosure components
Assembly method
Sequenced frame, enclosure and service installation on site
01

Prepared components

Frame members, panels, boards, openings and selected electrical items follow the approved schedule.

02

Protected packing

Components are grouped, wrapped and identified for the confirmed container or truck loading plan.

03

Sequenced assembly

Floor, columns, roof, enclosure and openings are installed in the approved order.

04

Project fit-out

Room layout, finishes, electrical standard and external connections follow the order documents.

Supplier assurance

Review the capability behind the component package

A detachable system depends on accurate member preparation, component identification, packing control and complete order documentation. Review those controls together with the selected product schedule.

Premium Modular House factory entrance with marked vehicle access in Zhaoqing
Premium Modular House factory entrance in Zhaoqing

Reference configurations

Select the structural schedule before quotation

The two supplied schedules share the same reference dimensions but use different member thicknesses, sheet gauges and opening specifications.

Specification itemQuality referenceBasic reference
External dimensions5990 × 2990 × 2800 mm5990 × 2990 × 2800 mm
Internal clear dimensions5820 × 2720 × 2450 mm5820 × 2720 × 2450 mm
Column reference210 × 150 mm galvanized cold-formed steel, 2.3 mm210 × 150 mm galvanized cold-formed steel, 2.0 mm
Floor main beam160 mm section, 2.3 mm160 mm section, 2.0 mm
Roof sheet0.426 mm profiled colour steel0.376 mm profiled colour steel
Ceiling liner0.326 mm profiled colour steel0.286 mm profiled colour steel
Wall panel50 mm rock-wool sandwich panel, 0.286 mm steel skins50 mm rock-wool sandwich panel, 0.276 mm nominal steel skins
Door reference840 × 2035 mm A-grade steel door920 × 1980 mm C-grade steel door
Window reference1130 × 1100 mm PVC sliding window, single glazing, security bars and screen950 × 1100 mm PVC window, single glazing and security bars, without screen

Specification control: The selected schedule, approved drawings and signed quotation define the final model. Do not combine values from the basic and quality references unless the variation is recorded in the order documents.

Model confirmation

Need the correct schedule for your destination?

Send the location, room use, quantity, electrical standard, site access and target delivery date so the quotation can identify the applicable configuration.

Confirm Model & Scope

System components

Confirm every package layer before production

The reference schedules identify the component build-up below. Gauge, opening and electrical selections remain tied to the approved basic or quality configuration.

Primary frame
Galvanized cold-formed columns and beams joined with M12 × 35 high-strength bolts; powder-coated finish listed at 80 μm or greater.
Roof system
Flat roof with organised internal drainage, profiled external sheet, 50 mm glass-wool insulation and profiled internal liner.
Wall system
50 mm rock-wool sandwich panels with a 60 kg/m³ insulation core and A1 non-combustible rating in the supplied schedule.
Floor system
Galvanized floor framing with an 18 mm cement floor board. Final floor finish is confirmed separately.
Doors and windows
Steel door and PVC window dimensions differ between the basic and quality references and must follow the selected schedule.
Electrical option
The source schedule lists a 220 V, 50 Hz reference package. Voltage, sockets, protection and wiring must be coordinated to the destination.

Configuration control

Record each selection against one approved schedule

The order should connect every variation to the model, room function, destination and assigned responsibility.

  1. 01
    Reference schedule

    Select the basic or quality frame and enclosure basis before individual variations are priced.

  2. 02
    Room use and layout

    State occupancy, furniture, internal zoning, openings and circulation requirements.

  3. 03
    Services and destination

    Record voltage, socket standard, utility interfaces and any plumbing or sanitary scope.

  4. 04
    Packing and assembly

    Coordinate component labels, container plan, unloading access, tools, crew and target programme.

Packing and assembly

Control the sequence from packing list to completed unit

A component-built system relies on correct identification, protected unloading and disciplined assembly. The approved drawings and method statement govern the work.

  1. 01Confirm the project brief and site constraints
  2. 02Approve the reference schedule and drawings
  3. 03Prepare, inspect and label the components
  4. 04Approve packing, unloading and storage arrangements
  5. 05Assemble the frame, enclosure and openings
  6. 06Complete services, inspection and handover
Detachable container house panels and structural components loaded inside an open delivery truck
Structural and enclosure components arranged for the approved delivery plan

Site responsibility: Bearing surfaces, local permits, unloading access, temporary storage, assembly tools, external utilities, testing and commissioning must be assigned in the project responsibility matrix.

Project applications

Match the system to a defined operational need

Suitability depends on occupancy, local approval, climate, service demand, access and the approved configuration.

01

Worker accommodation

Repeatable sleeping or welfare rooms planned around occupancy and utility demand.

02

Construction camps

Temporary project buildings where component transport and staged assembly suit the site plan.

03

Site offices and classrooms

Single or connected rooms with destination-specific openings, finishes and electrical scope.

04

Remote project support

Support spaces coordinated with restricted access, storage, assembly and utility conditions.

Project enquiry

Request a detachable package tied to your project

Share the destination, intended use, quantity, required utilities, access conditions and target date. The response can then define the schedule, supply scope, packing plan and assembly responsibilities.

Start a Project Enquiry
What is included in the detachable package?

The approved schedule defines the structural frame, roof and floor components, wall panels, openings, fasteners and selected electrical items. Packing lists and quotation documents control the final supply.

What is the difference between the basic and quality references?

The quality reference uses thicker columns and floor main beams, higher roof and ceiling sheet gauges, a different wall-panel profile and upgraded opening specifications.

Does assembly require a crane?

The system is delivered as separate components rather than a completed volumetric unit. The required lifting aids, unloading method and assembly equipment depend on the approved method statement and site conditions.

Can several units create a larger building?

Units can be coordinated into connected layouts when structural interfaces, weather sealing, circulation, utilities and local approval are addressed in the project drawings.

Electrical Configuration Options

Switches, sockets and wiring can be configured to Australian, US, European or other destination-market requirements. Any regional configuration shown in the specifications is a base option, not the only choice.

Specify the destination and required electrical standards when enquiring. Final component specifications and included items are confirmed in the agreed proposal and quotation.

Discuss Your Configuration →