Coordinate a temporary site boundary around the actual alignment, access points, ground conditions, selected finish and installation responsibility.



Bases de planificación
Define the Boundary Before Selecting the System
The supplied technical material records A1, A2, A3 and C3 hoarding references together with a precast base option. Selection still depends on the site plan, required access, ground interface, appearance and agreed delivery boundary.
Boundary layout
Provide the total run, corners, level changes, interfaces with existing structures and any areas that require a different treatment.
Access openings
Identify vehicle gates, pedestrian gates, temporary openings, clear widths, operating method and access-control interfaces.
Ground interface
Confirm ground condition, available fixing zone, drainage constraints, buried-service restrictions and whether a precast base is being considered.
Finish and identity
Confirm the required colour, painted finish, site graphics or signage zones and any destination-specific visual requirements.
Definición del sistema
Steel Hoarding Models & Components
Compare panel arrangements, supports, finishes and base options for your site boundary.
| Flujo de trabajo | Decisión | Qué confirmar |
|---|---|---|
| Painted series | A1, A2 and A3 | Use the selected reference as the starting point for panel arrangement, support spacing, finish and project detailing. |
| Hoarding series | C3 | Confirm the required configuration, colour, openings, alignment and interfaces for the project. |
| Base interface | Precast base reference | Review the base option against the ground condition, fixing approach, handling requirement and site access. |
| Límite de instalación | Factory preparation / site assembly | Confirm what is prepared before dispatch and what cutting, welding, coating, assembly or making-good remains on site. |
Cotización comparable
Issue One Coordinated Hoarding Brief
A comparable proposal needs the same boundary plan, interface assumptions and finish schedule across all bidders.
Send Hoarding RequirementsPreguntas sobre adquisiciones
Prefabricated Steel Site Hoarding FAQs
Explore models, finishes, ground connections and quotation requirements.
Are the A1, A2, A3 and C3 references fixed specifications?
No. They are documented reference families. The approved proposal must state the selected arrangement, dimensions, finish, supports, base interface and project boundary.
Can vehicle and pedestrian gates be included?
Gate positions and types can be reviewed when clear opening, operation, access control, traffic route and interface information are provided. Inclusion must be recorded in the proposal.
How is the ground connection selected?
It depends on the site condition, available fixing area, buried services, drainage constraints, handling access and the agreed temporary-works or foundation responsibility.
What should be confirmed for the finish?
Confirm colour, coating or paint requirement, graphics zones, exposed cut or weld treatment, site touch-up responsibility and acceptance criteria.
¿Qué información se necesita para una cotización?
Send the boundary plan, total length, corners and level changes, gate schedule, ground information, required finish, delivery location, site access and requested supply-and-installation boundary.