{"id":5118,"date":"2026-10-09T06:41:27","date_gmt":"2026-10-09T06:41:27","guid":{"rendered":"https:\/\/modularhouseprefab.com\/?p=5118"},"modified":"2026-10-09T06:41:27","modified_gmt":"2026-10-09T06:41:27","slug":"shantou-106-unit-flat-pack-office-accommodation-camp","status":"publish","type":"post","link":"https:\/\/modularhouseprefab.com\/ar\/shantou-106-unit-flat-pack-office-accommodation-camp\/","title":{"rendered":"\u0645\u0639\u0633\u0643\u0631 \u0645\u0646 106 \u0648\u062d\u062f\u0627\u062a \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641"},"content":{"rendered":"<div class=\"ppa-prose\">\n<h2 id=\"camp-functions\">01. Office and living areas<\/h2>\n<p>This flat-pack camp brought site offices and workforce accommodation into one 106-unit project. The office area and living area were assigned to separate groups of units, allowing each part of the camp to serve its own daily activities.<\/p>\n<p>The white living-area units and grey office-area units give the camp a clear visual distinction. The grey-framed blocks use two-storey construction; repeated door and window openings follow the individual room bays. The office and living areas use the same building format without being treated as the same room layout.<\/p>\n<figure class=\"pmh-cb-figure pmh-cb-figure--portrait\"><img loading=\"lazy\" width=\"900\" height=\"1600\" src=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-office-block-assembly.webp\" class=\"attachment-full size-full\" alt=\"Two-storey grey-framed office block with doors and windows during assembly\" decoding=\"async\" sizes=\"auto, (min-width:1000px) 780px, 100vw\" srcset=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-office-block-assembly.webp 900w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-office-block-assembly-169x300.webp 169w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-office-block-assembly-576x1024.webp 576w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-office-block-assembly-768x1365.webp 768w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-office-block-assembly-864x1536.webp 864w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-office-block-assembly-7x12.webp 7w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-office-block-assembly-600x1067.webp 600w\" \/><figcaption>Two-storey grey-framed blocks during assembly of the office area.<\/figcaption><\/figure>\n<h2 id=\"component-delivery\">02. Components arrive on site<\/h2>\n<p>The flat-pack office and accommodation camp arrived as stacked floor and roof sections, columns and enclosure components. The delivery truck, handling equipment and component stacks occupied the same working area while installation was under way.<\/p>\n<p>This is where the transport format becomes part of the site plan. The receiving team needs room to unload and keep the next components accessible without blocking the building footprint. Flat-pack delivery reduces the volume occupied by empty room space during transport, but unloading and assembly space still have to be planned.<\/p>\n<figure class=\"pmh-cb-figure\"><img loading=\"lazy\" width=\"1920\" height=\"1080\" src=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-delivery-floor-sections.webp\" class=\"attachment-full size-full\" alt=\"\u0642\u0637\u0627\u0639\u0627\u062a \u0623\u0631\u0636\u064a\u0627\u062a \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641 \u0628\u062c\u0648\u0627\u0631 \u0634\u0627\u062d\u0646\u0629 \u062a\u0633\u0644\u064a\u0645 \u0641\u064a \u0645\u0648\u0642\u0639 \u0645\u0639\u0633\u0643\u0631 \u0634\u0627\u0646\u062a\u0648\" decoding=\"async\" sizes=\"auto, (min-width:1000px) 780px, 100vw\" srcset=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-delivery-floor-sections.webp 1920w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-delivery-floor-sections-300x169.webp 300w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-delivery-floor-sections-1024x576.webp 1024w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-delivery-floor-sections-768x432.webp 768w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-delivery-floor-sections-1536x864.webp 1536w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-delivery-floor-sections-18x10.webp 18w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-delivery-floor-sections-600x338.webp 600w\" \/><figcaption>Floor sections laid out beside incoming component stacks and a delivery truck.<\/figcaption><\/figure>\n<h2 id=\"frame-assembly\">03. Floors and frame connections<\/h2>\n<p>Assembly began with the floor sections at the prepared supports. Columns were then connected at the corners to form the room frames. The repeated bays allowed the camp to be built up from individual units rather than delivered as a fully enclosed building.<\/p>\n<p>At the corners, the column-to-floor interface forms a repeated connection detail. Positioning the supports and aligning the floor frames are part of the assembly work; the structural connections follow the drawings for the selected building.<\/p>\n<figure class=\"pmh-cb-figure\"><img loading=\"lazy\" width=\"1920\" height=\"1080\" src=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-floor-placement.webp\" class=\"attachment-full size-full\" alt=\"Grey flat-pack floor sections being positioned on prepared concrete supports\" decoding=\"async\" sizes=\"auto, (min-width:1000px) 780px, 100vw\" srcset=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-floor-placement.webp 1920w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-floor-placement-300x169.webp 300w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-floor-placement-1024x576.webp 1024w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-floor-placement-768x432.webp 768w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-floor-placement-1536x864.webp 1536w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-floor-placement-18x10.webp 18w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-floor-placement-600x338.webp 600w\" \/><figcaption>Grey floor sections being positioned at the concrete support lines.<\/figcaption><\/figure>\n<figure class=\"pmh-cb-figure\"><img loading=\"lazy\" width=\"1920\" height=\"1080\" src=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-column-base-connection.webp\" class=\"attachment-full size-full\" alt=\"Close view of a grey flat-pack column connection at floor level\" decoding=\"async\" sizes=\"auto, (min-width:1000px) 780px, 100vw\" srcset=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-column-base-connection.webp 1920w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-column-base-connection-300x169.webp 300w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-column-base-connection-1024x576.webp 1024w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-column-base-connection-768x432.webp 768w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-column-base-connection-1536x864.webp 1536w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-column-base-connection-18x10.webp 18w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-column-base-connection-600x338.webp 600w\" \/><figcaption>Column-to-floor frame connection during assembly.<\/figcaption><\/figure>\n<h2 id=\"enclosure\">04. Panels, doors and windows<\/h2>\n<p>After the frames took shape, enclosure work followed. Wall-panel stacks were staged beside the assembly areas, and doors and windows were installed into the room elevations. In the white units, the panel package can be seen inside the open frame before the enclosure is complete.<\/p>\n<p>For this type of camp, the product advantage is the combination of a repeatable frame and room-specific fit-out. Office and accommodation layouts can use the same modular format while keeping different partitions, entrances and service requirements. The actual layout, finishes and service provisions can be customized to suit each project.<\/p>\n<figure class=\"pmh-cb-figure\"><img loading=\"lazy\" width=\"1920\" height=\"1080\" src=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-wall-panel-installation.webp\" class=\"attachment-full size-full\" alt=\"Wall-panel stacks and enclosure assembly inside a white flat-pack frame\" decoding=\"async\" sizes=\"auto, (min-width:1000px) 780px, 100vw\" srcset=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-wall-panel-installation.webp 1920w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-wall-panel-installation-300x169.webp 300w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-wall-panel-installation-1024x576.webp 1024w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-wall-panel-installation-768x432.webp 768w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-wall-panel-installation-1536x864.webp 1536w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-wall-panel-installation-18x10.webp 18w, https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-flat-pack-camp-wall-panel-installation-600x338.webp 600w\" \/><figcaption>Wall panels staged inside a white flat-pack frame during enclosure work.<\/figcaption><\/figure>\n<h2 id=\"planning-links\">05. Planning a similar camp<\/h2>\n<p>A new office and accommodation camp should start with the room list and available plot. Confirm who will use the offices, how accommodation will be arranged, and where delivery vehicles can unload. The room mix, building arrangement and installation plan can then be developed around the actual project.<\/p>\n<p>Premium Modular House can coordinate the flat-pack package with the proposed office and living-area functions. Start with the <a href=\"https:\/\/modularhouseprefab.com\/ar\/flat-pack-container-house\/\">\u0645\u0646\u0632\u0644 \u062d\u0627\u0648\u064a\u0627\u062a \u0645\u0633\u0637\u062d \u0627\u0644\u062a\u063a\u0644\u064a\u0641<\/a> product page, then review <a href=\"https:\/\/modularhouseprefab.com\/ar\/site-offices-command-centers\/\">site office planning<\/a> \u0648 <a href=\"https:\/\/modularhouseprefab.com\/ar\/worker-accommodation-camps\/\">worker accommodation options<\/a>.<\/p>\n<p>For the steps before the first truck arrives, read our <a href=\"https:\/\/modularhouseprefab.com\/ar\/flat-pack-camp-site-preparation\/\">flat-pack camp site preparation guide<\/a>. For construction-site delivery planning, the UK Health and Safety Executive provides a useful <a href=\"https:\/\/www.hse.gov.uk\/construction\/safetytopics\/vehiclestrafficmanagement.htm\">traffic-management reference<\/a> on separating pedestrians and vehicles. Local requirements and the project&#8217;s site procedures govern the work.<\/p>\n<h2 id=\"project-faq\">06. Project questions<\/h2>\n<div class=\"ppa-faq\">\n<details>\n<summary>How many flat-pack units were used?<\/summary>\n<p>The Shantou office and accommodation camp project used 106 flat-pack container units in total.<\/p>\n<\/details>\n<details>\n<summary>Was this a modular school building?<\/summary>\n<p>No. The units formed temporary offices and workforce accommodation supporting the school construction project.<\/p>\n<\/details>\n<details>\n<summary>How were the two areas distinguished?<\/summary>\n<p>White units were allocated to the living area and grey units to the office area. The same flat-pack building format supported the different uses.<\/p>\n<\/details>\n<details>\n<summary>Can the camp layout be adapted for another project?<\/summary>\n<p>Yes. Room functions, unit quantities, storey arrangement, finishes and services can be planned to suit the actual site and project requirements. A new layout needs its own technical review.<\/p>\n<\/details>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u0645\u0639\u0633\u0643\u0631 \u0645\u0643\u0627\u062a\u0628 \u0648\u0633\u0643\u0646 \u0645\u0646 106 \u0648\u062d\u062f\u0627\u062a \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641 \u0644\u0645\u0634\u0631\u0648\u0639 \u0625\u0646\u0634\u0627\u0621 \u0645\u062f\u0631\u0633\u0629 \u0641\u064a \u0634\u0627\u0646\u062a\u0648 \u0628\u0627\u0644\u0635\u064a\u0646\u060c \u0628\u0648\u062d\u062f\u0627\u062a \u0628\u064a\u0636\u0627\u0621 \u0644\u0645\u0646\u0637\u0642\u0629 \u0627\u0644\u0633\u0643\u0646 \u0648\u0648\u062d\u062f\u0627\u062a \u0631\u0645\u0627\u062f\u064a\u0629 \u0644\u0645\u0646\u0637\u0642\u0629 \u0627\u0644\u0645\u0643\u0627\u062a\u0628.<\/p>","protected":false},"author":1,"featured_media":5112,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"pmh_case_display_title":"Shantou 106-Unit Flat-Pack Camp","pmh_case_country":"China","pmh_case_application":"Temporary site offices and workforce accommodation","pmh_case_system":"Flat-pack container house","pmh_case_quantity":"106","pmh_case_functions":"Site offices and workforce accommodation","pmh_case_summary":"A 106-unit flat-pack office and accommodation camp for a school construction project in Shantou, China, with white living-area units and grey office-area units.","pmh_case_detail_heading":"","pmh_case_detail_1":"","pmh_case_detail_2":"","pmh_case_primary_caption":"Flat-pack frame assembly at the Shantou camp.","pmh_case_secondary_caption":"Component delivery and floor sections at the Shantou camp site.","pmh_case_source_note":"","pmh_case_order":0,"pmh_case_primary_image_id":5112,"pmh_case_secondary_image_id":5113,"footnotes":""},"categories":[624,642,606,625,605,621],"tags":[],"class_list":["post-5118","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-accommodation-projects","category-asia-projects","category-construction","category-office-command-projects","category-project-cases","category-camp-projects"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shantou 106-Unit Flat-Pack Camp | Premium Modular House<\/title>\n<meta name=\"description\" content=\"Explore Shantou&#039;s 106-unit flat-pack camp for site offices and workforce accommodation, with photos of component delivery, frame assembly and wall installation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/modularhouseprefab.com\/ar\/shantou-106-unit-flat-pack-office-accommodation-camp\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shantou 106-Unit Flat-Pack Camp | Premium Modular House\" \/>\n<meta property=\"og:description\" content=\"Explore Shantou&#039;s 106-unit flat-pack camp for site offices and workforce accommodation, with photos of component delivery, frame assembly and wall installation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/modularhouseprefab.com\/ar\/shantou-106-unit-flat-pack-office-accommodation-camp\/\" \/>\n<meta property=\"og:site_name\" content=\"Premium Modular House\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61591959999512\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-09T06:41:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-106-flat-pack-camp-frame-assembly.webp\" \/>\n<meta name=\"author\" content=\"Premium Modular House\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Shantou 106-Unit Flat-Pack Camp | Premium Modular House\" \/>\n<meta name=\"twitter:description\" content=\"Explore Shantou&#039;s 106-unit flat-pack camp for site offices and workforce accommodation, with photos of component delivery, frame assembly and wall installation.\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"Premium Modular House\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/\"},\"author\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/#organization\",\"name\":\"Premium Modular House\"},\"headline\":\"\u0645\u0639\u0633\u0643\u0631 \u0645\u0646 106 \u0648\u062d\u062f\u0627\u062a \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641\",\"datePublished\":\"2026-10-09T06:41:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/\"},\"wordCount\":652,\"publisher\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/modularhouseprefab.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shantou-106-flat-pack-camp-frame-assembly.webp\",\"articleSection\":[\"\u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u0633\u0643\u0646\",\"\u0645\u0634\u0627\u0631\u064a\u0639 \u0622\u0633\u064a\u0627\",\"\u0627\u0644\u062a\u0643\u0648\u064a\u0646 \u0627\u0644\u0625\u0646\u0634\u0627\u0626\u064a\",\"\u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u0645\u0643\u0627\u062a\u0628 \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0642\u064a\u0627\u062f\u0629\",\"\u062f\u0631\u0627\u0633\u0627\u062a \u0627\u0644\u0645\u0634\u0627\u0631\u064a\u0639\",\"\u0645\u0634\u0627\u0631\u064a\u0639 \u0645\u0639\u0633\u0643\u0631\u0627\u062a \u0627\u0644\u0642\u0648\u0649 \u0627\u0644\u0639\u0627\u0645\u0644\u0629\"],\"inLanguage\":\"ar\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/\",\"url\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/\",\"name\":\"Shantou 106-Unit Flat-Pack Camp | Premium Modular House\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/modularhouseprefab.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shantou-106-flat-pack-camp-frame-assembly.webp\",\"datePublished\":\"2026-10-09T06:41:27+00:00\",\"description\":\"Explore Shantou's 106-unit flat-pack camp for site offices and workforce accommodation, with photos of component delivery, frame assembly and wall installation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/#primaryimage\",\"url\":\"https:\\\/\\\/modularhouseprefab.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shantou-106-flat-pack-camp-frame-assembly.webp\",\"contentUrl\":\"https:\\\/\\\/modularhouseprefab.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shantou-106-flat-pack-camp-frame-assembly.webp\",\"width\":1702,\"height\":1276,\"caption\":\"\u0647\u064a\u0627\u0643\u0644 \u0628\u064a\u0636\u0627\u0621 \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641 \u0648\u0645\u0643\u0648\u0646\u0627\u062a \u0645\u0643\u062f\u0633\u0629 \u0623\u062b\u0646\u0627\u0621 \u062a\u062c\u0645\u064a\u0639 \u0627\u0644\u0645\u0639\u0633\u0643\u0631 \u0641\u064a \u0634\u0627\u0646\u062a\u0648\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/shantou-106-unit-flat-pack-office-accommodation-camp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629\",\"item\":\"https:\\\/\\\/modularhouseprefab.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0645\u0639\u0633\u0643\u0631 \u0645\u0646 106 \u0648\u062d\u062f\u0627\u062a \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/#website\",\"url\":\"https:\\\/\\\/modularhouseprefab.com\\\/\",\"name\":\"Premium Modular House\",\"description\":\"\u0645\u0648\u0631\u0651\u062f \u0645\u0646\u0627\u0632\u0644 \u0648\u062d\u062f\u0627\u062a\u064a\u0629 \u0648\u0645\u0628\u0627\u0646\u064d \u0645\u0633\u0628\u0642\u0629 \u0627\u0644\u0635\u0646\u0639 \u0648\u0645\u0646\u0627\u0632\u0644 \u062d\u0627\u0648\u064a\u0627\u062a\",\"publisher\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/modularhouseprefab.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/#organization\",\"name\":\"Premium Modular House\",\"url\":\"https:\\\/\\\/modularhouseprefab.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/modularhouseprefab.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/cropped-Premium-Modular-House-ICO.png\",\"contentUrl\":\"https:\\\/\\\/modularhouseprefab.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/cropped-Premium-Modular-House-ICO.png\",\"width\":512,\"height\":512,\"caption\":\"Premium Modular House\"},\"image\":{\"@id\":\"https:\\\/\\\/modularhouseprefab.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=61591959999512\",\"https:\\\/\\\/www.instagram.com\\\/pmh.modular\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@premiumhouse_pm\",\"https:\\\/\\\/www.tiktok.com\\\/@pmh.modular?_r=1&_t=ZS-99G6bMEU4pk\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shantou 106-Unit Flat-Pack Camp | Premium Modular House","description":"Explore Shantou's 106-unit flat-pack camp for site offices and workforce accommodation, with photos of component delivery, frame assembly and wall installation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/modularhouseprefab.com\/ar\/shantou-106-unit-flat-pack-office-accommodation-camp\/","og_locale":"ar_AR","og_type":"article","og_title":"Shantou 106-Unit Flat-Pack Camp | Premium Modular House","og_description":"Explore Shantou's 106-unit flat-pack camp for site offices and workforce accommodation, with photos of component delivery, frame assembly and wall installation.","og_url":"https:\/\/modularhouseprefab.com\/ar\/shantou-106-unit-flat-pack-office-accommodation-camp\/","og_site_name":"Premium Modular House","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61591959999512","article_published_time":"2026-10-09T06:41:27+00:00","og_image":[{"url":"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-106-flat-pack-camp-frame-assembly.webp","type":"","width":"","height":""}],"author":"Premium Modular House","twitter_card":"summary_large_image","twitter_title":"Shantou 106-Unit Flat-Pack Camp | Premium Modular House","twitter_description":"Explore Shantou's 106-unit flat-pack camp for site offices and workforce accommodation, with photos of component delivery, frame assembly and wall installation.","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"Premium Modular House","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"3 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/#article","isPartOf":{"@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/"},"author":{"@id":"https:\/\/modularhouseprefab.com\/#organization","name":"Premium Modular House"},"headline":"\u0645\u0639\u0633\u0643\u0631 \u0645\u0646 106 \u0648\u062d\u062f\u0627\u062a \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641","datePublished":"2026-10-09T06:41:27+00:00","mainEntityOfPage":{"@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/"},"wordCount":652,"publisher":{"@id":"https:\/\/modularhouseprefab.com\/#organization"},"image":{"@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/#primaryimage"},"thumbnailUrl":"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-106-flat-pack-camp-frame-assembly.webp","articleSection":["\u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u0633\u0643\u0646","\u0645\u0634\u0627\u0631\u064a\u0639 \u0622\u0633\u064a\u0627","\u0627\u0644\u062a\u0643\u0648\u064a\u0646 \u0627\u0644\u0625\u0646\u0634\u0627\u0626\u064a","\u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u0645\u0643\u0627\u062a\u0628 \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0642\u064a\u0627\u062f\u0629","\u062f\u0631\u0627\u0633\u0627\u062a \u0627\u0644\u0645\u0634\u0627\u0631\u064a\u0639","\u0645\u0634\u0627\u0631\u064a\u0639 \u0645\u0639\u0633\u0643\u0631\u0627\u062a \u0627\u0644\u0642\u0648\u0649 \u0627\u0644\u0639\u0627\u0645\u0644\u0629"],"inLanguage":"ar"},{"@type":"WebPage","@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/","url":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/","name":"Shantou 106-Unit Flat-Pack Camp | Premium Modular House","isPartOf":{"@id":"https:\/\/modularhouseprefab.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/#primaryimage"},"image":{"@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/#primaryimage"},"thumbnailUrl":"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-106-flat-pack-camp-frame-assembly.webp","datePublished":"2026-10-09T06:41:27+00:00","description":"Explore Shantou's 106-unit flat-pack camp for site offices and workforce accommodation, with photos of component delivery, frame assembly and wall installation.","breadcrumb":{"@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/#primaryimage","url":"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-106-flat-pack-camp-frame-assembly.webp","contentUrl":"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2026\/10\/shantou-106-flat-pack-camp-frame-assembly.webp","width":1702,"height":1276,"caption":"\u0647\u064a\u0627\u0643\u0644 \u0628\u064a\u0636\u0627\u0621 \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641 \u0648\u0645\u0643\u0648\u0646\u0627\u062a \u0645\u0643\u062f\u0633\u0629 \u0623\u062b\u0646\u0627\u0621 \u062a\u062c\u0645\u064a\u0639 \u0627\u0644\u0645\u0639\u0633\u0643\u0631 \u0641\u064a \u0634\u0627\u0646\u062a\u0648"},{"@type":"BreadcrumbList","@id":"https:\/\/modularhouseprefab.com\/shantou-106-unit-flat-pack-office-accommodation-camp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629","item":"https:\/\/modularhouseprefab.com\/"},{"@type":"ListItem","position":2,"name":"\u0645\u0639\u0633\u0643\u0631 \u0645\u0646 106 \u0648\u062d\u062f\u0627\u062a \u0645\u0633\u0637\u062d\u0629 \u0627\u0644\u062a\u063a\u0644\u064a\u0641"}]},{"@type":"WebSite","@id":"https:\/\/modularhouseprefab.com\/#website","url":"https:\/\/modularhouseprefab.com\/","name":"Premium Modular House","description":"\u0645\u0648\u0631\u0651\u062f \u0645\u0646\u0627\u0632\u0644 \u0648\u062d\u062f\u0627\u062a\u064a\u0629 \u0648\u0645\u0628\u0627\u0646\u064d \u0645\u0633\u0628\u0642\u0629 \u0627\u0644\u0635\u0646\u0639 \u0648\u0645\u0646\u0627\u0632\u0644 \u062d\u0627\u0648\u064a\u0627\u062a","publisher":{"@id":"https:\/\/modularhouseprefab.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/modularhouseprefab.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/modularhouseprefab.com\/#organization","name":"Premium Modular House","url":"https:\/\/modularhouseprefab.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/modularhouseprefab.com\/#\/schema\/logo\/image\/","url":"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2025\/09\/cropped-Premium-Modular-House-ICO.png","contentUrl":"https:\/\/modularhouseprefab.com\/wp-content\/uploads\/2025\/09\/cropped-Premium-Modular-House-ICO.png","width":512,"height":512,"caption":"Premium Modular House"},"image":{"@id":"https:\/\/modularhouseprefab.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=61591959999512","https:\/\/www.instagram.com\/pmh.modular\/","https:\/\/www.youtube.com\/@premiumhouse_pm","https:\/\/www.tiktok.com\/@pmh.modular?_r=1&_t=ZS-99G6bMEU4pk"]}]}},"_links":{"self":[{"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/posts\/5118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/comments?post=5118"}],"version-history":[{"count":1,"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/posts\/5118\/revisions"}],"predecessor-version":[{"id":5124,"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/posts\/5118\/revisions\/5124"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/media\/5112"}],"wp:attachment":[{"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/media?parent=5118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/categories?post=5118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/modularhouseprefab.com\/ar\/wp-json\/wp\/v2\/tags?post=5118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}